Pervious macadam : trials on trunk road A38 Burton bypass, 1984.

Author(s)
Daines, M.E.
Year
Abstract

Full-scale trials of pervious macadam laid on A38 Burton bypass in 1984 are described. The objective of the trials is to compare the performance of a number of proprietary and non-proprietary materials made with a range of polymer-modified and unmodified bitumens. An experimental binder drainage test was used to specify the target binder contents. Analysis results show that generally binder drainage was not a problem; good control of both mixing temperature and binder content at the plant helped to ensure the successful laying of the trial materials. (Author/publisher)

Publication

Library number
C 40244 [electronic version only] /23 /26 /31 / IRRD 291846
Source

Crowthorne, Berkshire, Transport and Road Research Laboratory (TRRL), 1986, 20 p., 26 tab.; TRRL Research Report ; RR 57 - ISSN 0266-5247

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.