Tangents method for road picture construction.

Auteur(s)
Brummelaar, B.E.
Jaar
Samenvatting

THE AUTHOR HAS ENDEAVOURED TO INTRODUCE THE TANGENTS METHOD OF ROAD PICTURE CONSTRUCTION, WITHOUT GOING INTO THE ACTUAL DRAWING METHOD DETAILS. THE METHOD IS COMPARED WITH OTHER MANUAL PERSPECTIVE DRAWING TECHNIQUES AND THE USE OF COMPUTERS. ADVANTAGES AND SOME DISADVANTAGES ARE DISCUSSED. IN THE SECOND PORTION OF THE PAPER SEVERAL ROAD SITUATIONS ARE PICTORIALLY ANALYSED LEADING TO SOME SUGGESTIONS ON GOOD DESIGN PRACTICE FOR RAMP EXIT DESIGN AND IN THE CASES OF MINOR DISPLACEMENTS IN HORIZONTAL ALIGNMENTS. PERSPECTIVE ROAD PICTURES ARE WIDELY USED DURING THE ROAD DESIGN PROCESS. THEY MUST BE AVAILABLE AS SOON AS THE FIRST CENTRE-LINE LOCATION IS DISCUSSED, AS SMALL ALTERATIONS IN ALIGNMENTS TO IMPROVE DESIGN FORM LATER ARE COSTLY AND SHOULD BE AVOIDED. (A). FOR THE COVERING ABSTRACT OF THE CONFERENCE PROCEEDINGS SEE IRRD ABSTRACT NO. 226354.

Publicatie aanvragen

3 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 51480 (In: B 13293 [electronic version only]) /21 / IRRD 226343
Uitgave

In: Proceedings of the 8th Conference of the Australian Road Research Board, Perth, August 23 - 27, 1976. Volume 8, Part 5, Traffic Engineering, Session 24, p. 22-28, 7 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.