30 km-uur project Arnhem : herinrichting wijk Malburgen-west. Fase 1: literatuurstudie. In opdracht van het Ministerie van Verkeer en Waterstaat, Directie Verkeersveiligheid DVV.

Author(s)
Bureau Goudappel Coffeng
Year

Request publication

3 + 4 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
962021 ST
Source

Deventer, Bureau Goudappel Coffeng, 1986, 43 + 3 p. 17 ref.; VWB/263/30/Fd

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.