APPLICATION OF NEW ROCK DRILLING TECHNOLOGY TO FOREST ROAD CONSTRUCTION IN COASTAL BRITISH COLUMBIA

Author(s)
BENNETT, DM
Abstract

In 1988, the forest engineering research institute of canada initiated a series of studies to evaluate the effect of state-of-the-art drills on the techniques and costs of constructing low-volume forest roads in coastal british columbia. The fact that rubber-tired units are more mobile than conventional pneumatic tank drills has changed many aspects of constructing coastal logging roads. Total ownership and operating costs for the rock drills studied varied from $127 to $182 per hour (in canadan dollars). Average productivity varied from 97 to 128 m drilled per shift, and cost per meter drilled rangedfrom $9.15 To $14.43. Rock drill utilization levels ranged from 31 to 46%. The relatively low utilization levels result from lengthy nonmechanical delays associated with the overall forest road construction process; planning, work procedures, and the organization of crews and equipment can influence these figures. This paper appears in transportation research record no. 1291, Fifth international conference on low-volume roads, may 19-23, 1991, raleigh, north carolina, volume 2.

Request publication

18 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I 848313 IRRD 9206
Source

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1991-01-01 1291 PAG: 217-224 T4

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.