Abstract
An automatic control system at the Rheinallee-tunnel in Dusseldorf by means of a computer is described. A scheme of measure points and traffic signals in the tunnel is described. A physical method of vehicle measuring is given and the establishment of traffic disturbances or accidents is explained, together with the execution of signal programs.