The objective of the project was to develop design and cost information for the construction of a proving ground facility to perform testing on new- model buses.The proposed bus proving ground includes five facilities: a two- mile high speed track; a durability course; a dynamics area; a skid pad; and a hill. Costs are estimated to be more than 10 million dollar, without cost of land and buildings.

Request publication

17 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 28415 /91.1 /
Source

U.S.Department of Transportation /Urban Mass Transportation. University Park, Pa., The Pennsylvania State University /The Pennsylvania Transportation Institute, 1988, 10 p. PTI- Report No. 8804.