CPM-based system for scheduling and allocating resources to project design. Paper presented at the 53rd Annual Meeting of the Highway Research Board HRB, Washington, D.C., January 1974.

Author(s)
Oien, E.S. & Jonas, D.L.
Year
Abstract

The critical path method (CPM) for management as used in the design of engineering projects is discussed and a computer program as part of the CPM approach is examined. The input to the computer includes an estimate of time and manpower requirements for each activity of each project, the logical sequence of work activities for each project, the relative importance or priority of each project, and total manpower available to accomplish project design.

Request publication

1 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 8986 (In: B 5246 S) /10/ IRRD 213540
Source

In: Transportation Research Record TRR No. 480, 1974, p. 1-10, 10 fig.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.