CRASH TEST OF MODIFIED TEXAS C202 BRIDGE RAIL

Author(s)
HIRSCH, TJ ROMERE, P
Abstract

In 1980 a standard texas traffic rail, c202, was modified to increase its height and strength to restrain and redirect an 80, 000-lb (36, 300-kg) van-type tractor-trailer under 50-mph (80.5-Km/hr), 15-degree-angle impacts. The concrete parapet height was increased to 36 in. (91 Cm), and an elliptical steel rail was mounted on steel posts to increase the rail height to 54 in. (137 Cm). In 1980 one crash test was conducted on the bridge rail. The truck was restrained and smoothly redirected. This promising high-performance bridge rail was not tested at that time with passenger cars. The results of two successful crash tests with a 1, 918-lb (871-kg) car traveling at 61.3 Mph (98.6 Km/hr) striking at a 21-degree angle and with a 4, 400-lb (1, 998-kg) car traveling at 59.4 Mph (95.6 Km/hr) striking at a 25.9-Degree angle are presented. This paper appears in transportation research record no. 1258, Roadside safety 1990.

Request publication

6 + 13 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I 838487 IRRD 9104
Source

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1990-01-01 1258 PAG:23-31 T7

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.