Abstract
Purpose of this study was to quantitatively compare the consequences to the public constructing an at-grade intersection with the consequences of constructing a diamond interchange at an intersection between a rural expressway and an arterial highway. Two criteria, measured at various traffic volume combinations and at different traffic conditions, were selected for presentation-level of service and comparison of user benefits with construction and maintenance costs.