Criteria en keuzen bij de uitbouw van het Hoofdwegennet.

Author(s)
Kooy, J.A.M. van der
Year
Abstract

After the treatment of the Dutch Highway Network-plan in the parliament it can not be said that the network can be built in the coming of 20 or 30 years. The public discussion has, also on the different board-levels, led to a break down. It is needed to define the arguments and the goals more sophisticated and to make a number of choices which will guarantee that a smaller part of the network can be built but in a structural way.

Request publication

8 + 4 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 18657 (In: B 18651 [electronic version only]) /21/ IRRD 255839
Source

In: Verkeerskundige Werkdagen 1981, Driebergen, 13 - 14 mei 1981, p. 101-113, 5 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.