The data needs of activity scheduling models.

Author(s)
Axhausen, K.W.
Year
Abstract

This paper discusses the data needs of models of activity scheduling, as distinct from models of activity generation. The discussion is based on a preliminary definition of "activity" and a framework built on the concepts of time horizons, budgets and constraints.

Request publication

8 + 12 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
960377 j ST (In: ST 960377 [electronic version only])
Source

In: Papers of the European Institute of Retailing and Service Studies EIRASS conference "Activity based approaches : activity scheduling and the analysis of activity patterns", Eindhoven, The Netherlands, May 25-28, 1995, 18 p., 23 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.