Development of rapid crossing methods for over-bridge crossing system.

Author(s)
Mishima, Y. Minada, R. & Yamamoto, T.
Year
Abstract

In recent Japanese urban restoration programs, the resolution of serious traffic congestion at surface crossing points has become more important for both automobile and railway crossings. The over-bridge crossing system is very effective for the solution of traffic congestion, but it sometimes brings about more congestion owing to traffic restrictions, and also the environmental deterioration of surroundings and these can be reduced by realizing a significant reduction in the construction period. The Japan Bridge Association (JBA) members have further studied and developed, on the basis of social needs," Rapid Construction Methods for Over-bridge Crossing System" which realizes the installation of an over-bridge at surface traffic congestion points in a short construction period. In this report, the outline of rapid construction methods developed by the JBA members, is introduced first, and then two construction examples are discussed. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.

Request publication

4 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 46586 (In: C 46558 CD-ROM) /24 /72 / ITRD E214865
Source

In: On the road to the future : 12th REAAA conference, Philippines, 2006 technical papers, Philippine International Convention Center (PICC), Manila, November 20-24, 2006, 11 p., 2 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.