A digital simulation program of a section of freeway with entrance and exit ramps.

Author(s)
Buhr, J.H. Meserole, T.C. & Drew, D.R.
Year
Abstract

A computer program developed for the simulation of a section of freeway, including several exit and entrance ramps is described. The program allows for the simulation of the traffic operation under different modes of entrance ramp control: fixed-rate metering, demand-capacity metering, gap- acceptance control and, of course, no control. The computer logic and simulation technique are discussed in detail. Limited output of the program is presented as evidence of the feasibility and realism of the simulation model. /author/.

Request publication

1 + 0 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
A 2360 [electronic version only] (In: A 2358 S)
Source

In: Highway Research Record 230, 1968, p. 15-31, 4 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.