DO ROAD PROJECTS BENEFIT INDUSTRY? A CASE STUDY OF THE HUMBER BRIDGE.

Author(s)
MacKie, P.J. & Simon, D.
Year
Abstract

A PRIME JUSTIFICATION FOR THE ROADS PROGRAMME IS TO IMPROVE INDUSTRIAL COMPETITIVENESS BY REDUCING TRANSPORT COSTS. YET LITTLE EMPIRICAL WORK HAS BEEN DONE TO EXAMINE THIS LINKAGE. THIS IS BECAUSE ROADS TEND TO BE IMPROVED INCREMENTALLY EXCEPT WHERE ESTUARIES ARE CROSSED. A CASE STUDY OF 52 REGULAR COMMERCIAL USERS OF THE NEW HUMBER BRIDGE DEMONSTRATES THAT OPERATORS ADJUSTED BY INCREASING VEHICLE UTILISATION, INCREASING MARKET PENETRATION, CHANGING MARKET AREAS SERVED, AND BY INTERNAL RATIONALISATION. LABOUR TIME SAVINGS COULD GENERALLY BE PRODUCTIVELY USED SO THAT IN THIS CASE, THE "COST SAVING" APPROACH TO VALUING WORKING TIME SAVINGS IS NOT UNREASONABLE.(Author/publisher).

Request publication

5 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I 294695 [electronic version only] /10 / IRRD 294695
Source

Journal of Transport Economics and Policy. 1986 /09. 20(3) Pp377-84 (1 Figs.; 1 Tbls.; 12 Refs.)

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.