Abstract
The village Bleiswijk had a ribbon-building with an increasing through traffic causing a lot of problems, as a relative high speed, noise hindrance and an attack on the living with traffic. In the framework of BREV projects different countermeasures were constructed, after which a before and after study was made to the effects of these measures. The new layout of the road and the results of the before and after study are discussed.