Abstract
The steady state optimization of expressway system operations when peak demands exceed capacities is investigated. An alternative approach of using travel-rate or average traffic flow of the whole expressway system instead of input rate as the criterion of optimization is adapted. This leads to a linear programming problem Residual effects of peak-period traffic are taken into consideration in computing total time to return to normal traffic pattern.