Abstract
The aim of the study was the variance analyses of side winds which can disturb the equilibrium of a vehicle in the neighbourhood of engineering works and to study eventual modifications to such engineering works and if there was a possibility to provide them with wind shields. The study was undertaken on a motorway which crossed a highway under and over.