Evaluatie herinrichting Bergsestraat te Wouw : hoofdrapport + bijlagen. Onderzoek in opdracht van het Ministerie van Verkeer en Waterstaat Directie Verkeersveiligheid.

Author(s)
-
Year
Abstract

In the framework of the BREV projects the Bergsestraat in the city of Wouw was redesigned and reconstructed into a 30 km /hour road. A before and after study is used to evaluate the reconstruction. Even if the average speed in the Bergsestraat is decreased, people perceive the speed still too fast. In general people are content on the less concentration of traffic, the decrease of traffic noise and traffic hindrance. However, there are still some negative aspects for pedestrians.

Request publication

8 + 11 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 31743 a+b /21 /82 /
Source

Den Haag, Adviesbureau van Roon, 1986, 124 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.