Evaluatie ontwerp tunnel Rijksweg 14 bij Voorburg. In opdracht van het Directoraat-Generaal Rijkswaterstaat, Adviesdienst Verkeer en Vervoer AVV.

Author(s)
Kaptein, N.A. & Theeuwens, J.
Year
Abstract

The city of Voorburg plans to build part of the A14 (between motorway A4 and the railroad The Hague-Amsterdam) as a tunnel, with the road surface partially at ground level. The tunnel is interrupted twice by level signalized intersections. This report investigates which safety criteria the tunnel design should meet, and to what extent the present design sufficiently fulfils the requirements. The present design does not meet all criteria due to the small length of the road section between the tunnel entrance and the intersection. For the presently proposed tunnel design, if a design speed of 70 km/h would be applied, a length of the uncovered road section between the tunnel and intersection of 160 meter would be sufficient, if both for the tunnel entrances as well as for the crossing standard design requirements are met. It is shown to what extent criteria would be less restrictive for some alternative design solutions. See also C 8157 (IRRD 890417).

Request publication

5 + 3 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 8156 [electronic version only] /21 /25 /82 / IRRD 890416
Source

Soesterberg, TNO Technische Menskunde TM, 1996, 29 p., 18 ref.; Rapport TNO-TM 1996 C-32

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.