Evaluation of rail passenger equipment crashworthiness strategies.

Author(s)
Tyrell, D. & Perlman, A.B.
Year
Abstract

Comparisons are made of the effectiveness of competing crashworthiness strategies--crash energy management (CEM) and conventional passenger train design. CEM is a strategy for providing rail equipment crashworthiness that uses crush zones at the ends of cars. These zones are designed to collapse in a controlled way during a collision, distributing the crush among the train cars. This technique preserves the occupied spaces in the train and limits the decelerations of the occupant volumes. Two scenarios are used to evaluate the effectiveness of the crashworthiness strategies--(a) a train-to-train collision of a cab-car-led passenger train with a standing locomotive-led passenger train and (b) a grade-crossing collision of a cab-car-led passenger train with a standing highway vehicle. The maximum speed for which all the occupants are expected to survive and the predicted increase in fatalities and injuries with increasing collision speed are determined for both train designs. CEM is shown to significantly increase the maximum speed at which all the occupants could survive for both grade crossing and train-to-train collisions for cab-car-led trains, at the expense of modestly increasing the speeds at which occupants impact the interior in train-to-train collisions.

Request publication

7 + 3 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 32110 (In: C 32108 S [electronic version only]) /91 / ITRD E826042
Source

In: Railroad research : intercity passenger transporation, track design and mainenance, and hazardous materials transport, Transportation Research Record TRR No. 1825, p. 8-14, 25 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.