An evaluation is given of the first stage of the Central Control of Tramtraffic Experiment. The aim of the experiment was to improve the regularity of the trams using electronic information and control systems. The evaluation concerns two aspects in particular. A comparison of the past and present situation on the link based on the available data and a cost-benefit analysis based on the round trip times of the vehicles.
Abstract