Feasibility and costs of an elevated STOLport test facility and its potential for metropolitan use. Paper presented at the 53rd Annual Meeting of the Highway Research Board, Washington, January 1974.

Author(s)
Greenfield, S.S. & Adams, R.B.
Year
Abstract

Result of a study of the feasibility and costs of building an elevated vertical- or short-takeoff and landing (V/STOL) test facility that would eventually be expanded for revenue service are described. Engineering analyses were made of many structural schemes.

Request publication

14 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 10144 (In: B 8411 S) /72/ IRRD 215609
Source

In: Transportation Research Record TRR No. 522, 1974, p. 28-37, 3 fig., 1 graph., 4 ref.