The objective of this implementation project was to implement four AWEGS across Texas at intersections appropriate for the installation of AWEGS. After a survey across Texas, four sites were chosen in the Atlanta District, Pharr District, Odessa District, and San Antonio District. The AWEGS design plans were prepared for these four sites and submitted to the districts. These design plans were prepared for an intersection with high-speed approaches having the required dilemma zone detection design. The Atlanta District implementation was typical of the earlier implementation and used the TS-2 TS-1 conversion panel. However, the remaining implementations were configured for using enhanced BIUs. AWEGS software was also modified to account for rail preemption as the site in the Odessa District was being preempted by between 15 to 25 trains per day. Finally the implementation in the San Antonio District was redesigned to use radar detection for both dilemma zone and advance detection. AWEGS at the Atlanta, Pharr, San Antonio, and Odessa Districts have been implemented, and an evaluation of the system showed that AWEGS was performing satisfactorily at all sites. (Author/publisher)

Request publication

3 + 5 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
20102300 ST [electronic version only]
Source

College Station, TX, Texas A & M University, Texas Transportation Institute TTI, 2009, X + 74 p., 10 ref.; Report 5-5113-01-P1 / FHWA/TX-10/5-5113-01-P1

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.