The concept of a four-day work week is reviewed after which the potential impacts of total travel, peak period and safety are discussed. A freeway bottleneck and a major activity center were examined as case study. Application of the 4-day reduced both the duration of the time when demand exceeds capacity of the freeway bottleneck and the number of vehicles excess demands over capacity.

Request publication

8 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 1923 fo /72/
Source

Transportation Engineering Journal ASCE, Vol. 98, (1972), No. TE 3 (August), p 705-714, 2 fig., 4 tab.