Fuel usage factors in highway and bridge construction.

Author(s)
Skolnik, J. Brooks, M. & Oman, J.
Year
Abstract

This report includes fuel usage factors for work items in the construction and maintenance of highways and bridges. The report includes the Price Adjustment Calculator Tool, a Microsoft Excel® spreadsheet, designed to assist in the calculation of payment adjustments for construction projects using fuel price indices or fuel prices.Appendixes B, C, and D were not included in the print or PDF version of the report, however, they are downloadable from the following links: Appendix B - Outreach plan at http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_744AppendixB.pdf; Appendix C - PowerPoint® presentation and speaker notes at http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_744.xlsx; and Appendix D - News brief at http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_744AppendixD.pdf. (Author/publisher)

Publication

Library number
20131233 ST [electronic version only]
Source

Washington, D.C., Transportation Research Board TRB, 2013, 136 p., ref.; National Cooperative Highway Research Program NCHRP Report ; 744 / NCHRP- Project 10-81 - ISSN 0077-5614 / ISBN 978-0-309-25894-4

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.