Grondafwerking voor wegen.

Author(s)
SCW Werkgroep G4 `Afwerking grondwerken voor wegen'
Year
Abstract

The Working Group has drawn up guidelines for shoulders and taluds of the earth bed and specific earth works along the road with detailed information about type and thickness of the covering material, compaction of shoulders and taluds, further completion and seeding in. Particular attention is paid to the allowances in profiling and the accuracy checks for that purpose. In general, the Working Group opts for a maximum admissible (positive and negative) deviation of 5 cm.