Guide for the process of managing risk on rapid renewal projects.

Author(s)
Golder Associates Inc. Molenaar, K. Loulakis, M. & Ferragut, T.
Year
Abstract

TRB’s second Strategic Highway Research Program (SHRP 2) S2-R09-RW-2: Guide for the Process of Managing Risk on Rapid Renewal Projects describes a formal and structured risk management approach specifically for rapid renewal design and construction projects that is designed to help adequately and efficiently anticipate, evaluate, and address unexpected problems or “risks” before they occur. In addition to the report, the project developed three electronic tools to assist with successfully implementing the guide: • The rapid renewal risk management planning template (http://onlinepubs.trb.org/onlinepubs/shrp2/SHRP2_R09RiskManagementPlann…) will assist users with working through the overall risk management process. • The hypothetical project using risk management planning template (http://onlinepubs.trb.org/onlinepubs/shrp2/SHRP2_R09PlanningTemplatefor…) employs sample data to help provide an example to users about how to use the rapid renewal risk management template • The user’s guide for risk management planning template (http://onlinepubs.trb.org/onlinepubs/shrp2/SHRP2_R09ExcelTemplateUsersG…) will provide further instructions to users who use the rapid renewal risk management template. Renewal Project R09 also produced a PowerPoint presentation (http://onlinepubs.trb.org/onlinepubs/shrp2/SHRP2_R09_PowerPoint_RiskMan…) on risk management planning. (Author/publisher)

Publication

Library number
20140877 ST [electronic version only]
Source

Washington, D.C., Transportation Research Board TRB, 2014, 77 p., 13 ref.; The Second Strategic Highway Research Program SHRP 2 ; Report S2-R09-RW-2 - ISBN 978-0-309-27292-6

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.