Herinrichting Victor de Stuerstraat e.o. Maastricht

eindrapport. Deel 1
Author(s)
AGV Adviesgroep voor Verkeer en Vervoer
Year
Abstract

In the framework of the BREV projects the Victor de Stuersstraat in the city of Maastricht was redesigned and reconstructed. A before and after study is used to evaluate the reconstruction. The car traffic has decreased with 30 to 50%. Moped traffic with 30 to 35%. The speed level decreased and became more steady. The noise level decreased and the parking situation has improved.

Request publication

7 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 31731 a+b+c+d+e+f /21 /82 /
Source

Utrecht, AGV Adviesgroep voor Verkeer en Vervoer bv, 1983, 254 p. + app.; Eindrapport No. 265/1-203 / Project No. DVV: 25481-01

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.