Hogesnelheidstrein HST-Zuid : beginnen bij het begin.

Author(s)
Schoemaker, T.J.H.
Year
Abstract

In this paper a notion is given for a more strategic approach of the problem of the Paris-Amsterdam High Speed Train connection (the `South HST'). In a number of studies first of all attention is given to the trace of the line. However, tracing out of the line should be the result of an approach, where successively the function, the section of nodes and the selection of links is figured out. Finally, some attention is given to the location of stopping places within the selected nodes. (A)

Request publication

8 + 6 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 7035 (In: C 6992 [electronic version only]) /72 / IRRD 887624
Source

In: Colloquium Vervoersplanologisch Speurwerk CVS 1996 : beheersbare mobiliteit : een utopie ? : bundeling van bijdragen aan het colloquium gehouden te Rotterdam op 28 en 29 november 1996, deel 2, p. 751-763, 6 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.