I-35 W Urban corridor demonstration project : bus metered freeway system.

Author(s)
Hoffman, R.G.
Year
Abstract

The Twin City area of Minneapolis and St. Paul is in the process of implementing a bus metered freeway system in the I-35 W corridor. It is described how the buses will be given preferential access to the freeway through special bus ramps and an override of the ramp meter Automobiles will be metered onto the freeway when their presence will not reduce the desired level of service.

Request publication

2 + 3 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 5080 (In: B 4401 S) /72.6/73.1/ IRRD 209093
Source

In: Highway Research Record HRR No. 415, 1972, p. 20-24, 7 fig., 1 graph., 1 ref.;

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.