Implementation of public transportation systems.

Author(s)
Ettinger, J.
Year
Abstract

Activities funded under the Urban Mass Transportation Administration (UMTA) program are briefly outlined. Inclusions of project planning activities under the UMTA planning program provide a unique opportunity for carrying the program from initial planning through detailed design to implementation. A 5-year implementation program is outlined which consists of transit improvements (bus and rail) within the urban area.

Request publication

1 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 11120 (In: B 5255 S) /72.6/ IRRD 213685
Source

In: Issues in Public Transportation, proceedings of a conference held by the Highway Research Board at Henniker, New Hampshire, July 9-14, 1972, TRB Special Report No. 144, p. 112-113.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.