Abstract
Details are given of a new method for installing a high mast lighting column in the central reserve on the M 6 / M 56 interchange. The procedures for erecting and securing the columns onto the prepared foundations are given.
Details are given of a new method for installing a high mast lighting column in the central reserve on the M 6 / M 56 interchange. The procedures for erecting and securing the columns onto the prepared foundations are given.
Public Lighting, Vol. 38 (1973), No. 160 (March), p. 19-22, 9 fig.
This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.