Intégration des indicateurs de performance : Integration of performance indicators.

Author(s)
World Road Association PIARC, Technical Committee C4.1 Management of Road Infrastructure Assets; Morzier, C. & Baillemont, G. (chairs)
Year
Abstract

Road infrastructure management tends to be determined by objectives aiming at a sustainable socio-economic performance of the transport system. Such an approach requires performance indicators for the various stakeholders, which should be established by aggregating technical and non-technical indicators. The report introduces the « Drawer Concept » assigned to each area of interest, allowing the users to develop their own system according to their specific needs.The drawer includes advice on what to measure, how to measure it and recommendations for use. Examples are provided for various areas such as the environment, safety, finance, travel time, etc. (Author/publisher)

Request publication

16 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
20121135 ST [electronic version only]
Source

Paris, Association Mondiale de la Route AIPCR / World Road Association PIARC, 2008, 119 p.; 2008R06 - ISBN 2-84060-206-7

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.