ISA-project Ghent : large acceptance of Intelligent Speed Adaption.

Author(s)
Mol, J. de & Vlassenroot, S.
Year
Abstract

ISA-project Ghent : large acceptance of Intelligent Speed Adaptation. In October 2002, the first ISA-trial in Belgium started in Ghent. 34 cars and 3 buses were equipped with the ‘active accelerator pedal.’ The main objectives of the trial in Ghent were: to evaluate the effects of ISA on speed-change, traffic safety, drivers’ attitude and behaviour, and drivers’ acceptance; to create a further bearing surface of ISA and; to create an acceptance of ‘ISA as a potential for road-safety’ by the public opinion and decision makers. The test-drivers noticed a large acceptance of ISA. Even the drivers wished to keep the system after the trial. (Author/publisher)

Request publication

3 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
20041851 g3 ST (In: ST 20041851 [electronic version only])
Source

In: Innovatie : van inspiratie naar realisatie ? : 31ste Colloquium Vervoersplanologisch Speurwerk CVS : bundeling van bijdragen aan het colloquium gehouden te Zeist, 24 en 25 november 2004, deel 7, p. 1787-1805, 13 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.