Lichtadaptie moeilijkheden bij het uitkomen van metrotunnels.

Author(s)
Ellens, E. & Leebeek, H.J.
Year
Abstract

The problems of light adaptation when leaving an unlit subway tunnel can be solved in different ways. For the specific case of a tunnel at the planned new subway station Kralings Zoom at Rotterdam these possibilities are described. It is recommended to screen the bright parts of the sky visible between the platform roofs before and after leaving the tunnel

Request publication

4 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 18546 S /83.2/54/ IRRD
Source

Soesterberg, Instituut voor Zintuigfysiologie IZF TNO, 1978, 8 p., fig.; Rapport No. IZF- 1978-C 30

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.