Abstract
As smaller traffic surveys are a large part of the work of most traffic engineers, and funds are always limited, these surveys must be carefully planned to minimize expenditure. The three stages of surveys planning, data collection, and analysis- are discussed in detail with consideration of various techniques and practices.