Making the U-turn.

Author(s)
Greeman, A.
Year
Abstract

Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project. Residents are already saying that it offers time savings of 30 minutes on what was previously a difficult and congested journey along one of two city highways, criss-crossedby junctions and with journeys broken by stops and traffic lights. This article discusses the planning and design of the highway, including environmental features and artwork; and the extra features of the project.

Request publication

5 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I E140662 /15 /21 / ITRD E140662
Source

World Highways/Routes du Monde. 2008 /09. 17(7) Pp28-30

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.