Mobiliteitsscenario : wegbouwkundige aspecten.

Author(s)
Leeuwen, J.G. van Bastiaans. J.G. & Drent, J. van
Year
Abstract

Under the authority of the Dutch Minister of Transport and Public Works measures are being drawn up, as part of the so called "Randstad Accessibility Plan", for the optimisation and extension of the road network in this congested conurbation in the western part of the country. The aim of this is to protect commercial traffic between the economical centres of the country against delay. A solution to this problem in the road engineering field can be obtained by rapid execution of so called "knit on" constructions (road enlargements). Initial research yielded four geotechnical and three constructional possibilities. Although research into the feasibility of these alternatives has yet to be begun, it is still useful, considering the very short time allowed for the completion of the accessibility plan, to discuss these possibilities on road engineering study days.

Request publication

10 + 10 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 3254 (In: C 3245 S) /21 /52 / IRRD 821860
Source

In: Wegbouwkundige werkdagen 1988, Ede, 26 en 27 mei 1988, Deel 1: Stroom I : ontwerp - onderhoud - beheer, 12 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.