OPBRIDGE: AN INTEGRATED BRIDGE BUDGET FORECASTING AND ALLOCATIONMODULE AT THE STATE LEVEL

Author(s)
AL-SUBHI, KM JOHNSTON, DW FARID, F
Abstract

An overview is provided of the optimum bridge budget forecastingand allocation module (opbridge), a decision support system for bridge management at the state level. Opbridge has the capability of predicting funding requirements to achieve bridge system objectives specified by the bridge manager. Alternately, the program can optimally allocate limited budgets and predict performance of the bridge system. This paper appears in transportation research record no. 1268, Highway maintenance operations and research 1990.

Request publication

2 + 11 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I 840601 IRRD 9107
Source

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1990-01-01 1268 PAG:95-109 T3

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.