Optimalisatie van het openbaar vervoer in het oostelijk deel van de vervoerregio Utrecht.

Author(s)
Verdiesen, R.C.J.M. & Schmitz, M.W.J.
Year
Abstract

This study was carried out as part of the decision process with regard to the future public transport network in the eastern part of the Utrecht region. The aim is to optimize the bus network round the Zeist/De Bilt-Utrecht Central Station axis, in combination with the future tram connection between the Central Station and 'de Uithof'. The study tests three possible alternatives for the public transport network within a specified set of basic assumptions and limiting conditions. The study also pays attention to the transportation, exploitation and infrastructural aspects of the future public transport network.

Request publication

5 + 4 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 2472 (In: C 2414 [electronic version only]) /10 /72 / IRRD 862334
Source

In: Colloquium Vervoersplanologisch Speurwerk CVS 1993 : grenzen aan de vervoersplanologie, Rotterdam, 26 november 1993, deel 3, p. 1161-1174

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.