The Oresund link toll collection system.

Author(s)
Tveit, B.O.
Year
Abstract

By the time of the 7th ITS congress, the Oresund link toll collection system had been in operation for just over 4 months. The bridge, which was inaugurated by HRH the Queen of Denmark and HRH the King of Sweden on July 1st this year, represents the realisation of an old dream sustained over centuries by people on both sides of the Sound. The link, connecting Scandinavia to the European continent, will play an important part in the shaping of a new and powerful region of education, commerce and industry. This paper presents the technical solutions implemented, as well as the experiences from the commissioning phase and the first four months of regular operations.

Request publication

4 + 11 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 23123 (In: C 22454 CD-ROM) /10 /73 / ITRD E115208
Source

In: From vision to reality : proceedings of the 7th World Congress on Intelligent Transportation Systems ITS, Turin, Italy, 6-9 November 2000, 5 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.