Pedestrian delay at Pelican crossings in areas operating under SCOOT.

Author(s)
Hunt, J.G. Griffiths, J.D. & Hughes, K.M.
Year
Abstract

This report attempts to evaluate the costs of pedestrian delay at Pelican crossings operating in areas under SCOOT (Split, Cycle and Offset Optimisation Technique) control, and to explore alternative strategies which could be used to reduce pedestrian delay.

Publication

Library number
C 6 [electronic version only] /73.1 / IRRD 840725
Source

Crowthorne, Berkshire, Transport and Road Research Laboratory TRRL TRL, 1991, 20 p., 13 ref.; Contractor Report ; CR 249 - ISSN 0266-7045

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.