Performance budgeting system for highway maintenance management.

Author(s)
Jorgensen, R.
Year
Abstract

The primary object of this study was to develop a model performance budgeting system for highway maintenance, thereby considering factors of work load, criteria for establishment of maintenance levels, procedures for management planning, evaluation, and control. Simplicity and economy of installation and operation of the system were also considered.

Publication

Library number
B 2254 [electronic version only] /10/60/ IRRD 206466
Source

Washington, D.C., Highway Research Board HRB, 1972, 213 p., fig., graph., tab., ref.; NCHRP Report No. 131.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.