Performance of an integral bridge over the M1-A1 Link Road at Bramham Crossroads. Prepared for the Highways Agency, Quality Services (Civil Engineering).

Author(s)
Barker, K.J. & Carder, D.R.
Year
Abstract

This report describes the construction of an integral bridge on the M1-A1 Link Road. The bridge deck has two spans totalling approximately 50m and comprises prestressed concrete beams composite with a 200mm thick reinforced concrete slab. The deck is structurally connected to full height reinforced concrete abutments. Field instrumentation and measurements during construction are described together with seasonal effects arising from thermal expansion of the deck during its first three years in service. The findings are relevant to further updating of BA42 (DMRB 1.3) on the design of integral bridges. (Author/publisher)

Publication

Library number
C 20536 [electronic version only] /53 / ITRD E112192
Source

Crowthorne, Berkshire, Transport Research Laboratory TRL, 2001, IV + 38 p., 9 ref.; TRL Report ; No. 521 - ISSN 0968-4107

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.