Performance of lime cement-stabilized soils for the I-15 reconstruction project : Salt Lake City, Utah.

Author(s)
Bartlett, S. & Farnsworth, C.
Year
Abstract

The application and performance monitoring of lime cement stabilization were studied for the Interstate-15 Reconstruction Project at 300 West Street in Salt Lake City, Utah. Lime cement columns (LCCs) were used to support a large mechanically stabilized earth (MSE) wall constructed over soft foundation soils and in close proximity to a commercial building. The Utah Department of Transportation has installed instrumentation at this site to measure the construction and postconstruction deformation within the treated zone and around the adjacent building. Also, total pressure cells have been installed atop the treated zone and in an adjacent untreated area to measure differences in load transfer. The use of LCC-stabilized soil has reduced the amount of primary settlement from about 1 m without treatment to about 0.2 m in the treated zone. Ground settlement at the nearest wall of the adjacent building has been about 5 cm total during a 2.5-year monitoring period with 3 of the 5 cm occurring during MSE wall construction and surcharge placement. Also, measurements indicate that the global stability of the MSE wall foundation has been notably improved. It is hoped that the data gathered from this array will provide a valuable case history of LCC performance for evaluation and modeling.

Request publication

1 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 29818 (In: C 29811 S [electronic version only]) /42 / ITRD E822700
Source

In: Soil mechanics 2002, Transportation Research Record TRR 1808, p. 58-66, 5 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.