A preliminary study of cost of tunnel construction.

Author(s)
Margason, G. & R.G. Pocock.
Year
Abstract

A preliminary study has been made to obtain information on the broad breakdown of the price of driven-tunnel construction. Only the direct engineering prices of construction are discussed and no consideration is given to any indirect costs or benefits associated with sub-surface roads.

Publication

Library number
A 5595 [electronic version only] IRRD 50629
Source

Crowthorne, Road Research Laboratory RRL, 1970, 38 p., ref.; RRL Report 326

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.