Priority programming and project selection.

Author(s)
-
Year
Abstract

The procedures followed in programming (the matching of available projects with available funds to accomplish the goals of a given project) are outlined. The 15-step basic programming process, derived from a review of published documents and interviews with highway administrators, ranges from project initiation through modification. Several steps (e.g. prioritizing and financial analysis) are described in detail, and a list of definitions for the basic terms used in planning and programming is provided.

Publication

Library number
911515 ST S
Source

Washington, D.C., National Research Council NRC, Transportation Research Board TRB, 1978, 31 p., 32 ref.; National Cooperative Highway Research Program NCHRP, Synthesis of Highway Practice ; Report 48 - ISBN 0-309-02758-6

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.