Project management for Hai Van Tunnel construction project in Vietnam.

Author(s)
Ishimoto, I.
Year
Abstract

The Hai Van Pass located in coastal Central Vietnam, was the biggest traffic bottleneck on the National Highway No.1 linking the capital Hanoi with Ho Chi Minh. The road was often blocked due to landslides and slope failure during the rainy season. Construction of the tunnel, which is 6.3km long, started on 1st October 2000 and opened to traffic on 5 June 2005; the project scale is some US$200 million. A longitudinal ventilation system, invented and developed in Japan, was applied with SCADA (Supervisory Control And Data Acquisition system) in which all tunnel operation systems are integrated, monitored and controlled. An O&M agency was established by referring to the Japanese practice of highway tunnel operation. Several overall emergency response on-site drills were executed inside the tunnel just before the opening. A consultant had been taking proactive initiatives for work coordination among the contractors because all contractors were required to work simultaneously inside the tunnel in order to shorten the overall construction period. Work coordination meetings had been held on a weekly basis. Primavera P3 was used as a scheduling tool. A Guide to the Project Management Body of Knowledge (PMBOK Guide) was used for project management. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.

Request publication

9 + 0 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 46580 (In: C 46558 CD-ROM) /25 /54 / ITRD E214859
Source

In: On the road to the future : 12th REAAA conference, Philippines, 2006 technical papers, Philippine International Convention Center (PICC), Manila, November 20-24, 2006, 15 p., 13 ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.