Redevelopment of the Peace Bridge Plaza and border crossing at Fort Erie, Canada.

Author(s)
Tansley, G.D.
Year
Abstract

This paper outlines the design and construction of improvements to the Peace Bridge Border Crossing at Fort Erie, Ontario. The paper briefly describes the evolution of the Border Crossing from its inception in 1927 to the present, and describes the various components of the Border Crossing, their relationship to each other and how the design of the Plaza is affected by the operation of these components. The paper outlines the concept of Shared Border Management and how this concept will affect the design of Border Crossings in the future. For the covering abstract of the conference see ITRD nuber E211521.

Request publication

5 + 5 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 38362 (In: C 38346 CD-ROM) /21 / ITRD E211533
Source

In: Transportation without boundaries : proceedings of the 2006 annual conference and exhibition of the Transportation Association of Canada TAC, Charlottetown, Prince Edward Island, Canada, September 17-20, 2006, 21 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.