Reducing congestion from road works. Part 2: Use of temporary backfill. Prepared for the Transport for London, London Streets Directorate.

Author(s)
Carswell, I. Jordan, R.W. & Sadat-Shafaee, C.
Year
Abstract

The use of temporary backfill in road or street works as an ‘immediate reinstatement’ could provide benefits in terms of enabling the road to be opened during peak periods and actual works confined to off peak periods such as weekends. Trials using commonly available granular materials (Type 1, Sharp Sand and Pea Shingle) with a thin asphalt surface course were undertaken in a large 2m by 2m opening and trafficked under accelerating loading conditions using the TRL Pavement Test Facility. The results demonstrated that several options could provide a temporary running surface that could be trafficked for several days. This is an option that should be considered at the planning stage of any works. The use of temporary backfill in an opening immediately adjacent to the carriageway to maximise the number of running lanes is also considered. The report also examines the cost benefits to be gained. (Author/publisher)

Publication

Library number
20130830 ST [electronic version only]
Source

Crowthorne, Berkshire, Transport Research Laboratory TRL, 2013, 45 p., 7 ref.; Published Project Report ; PPR 655 - ISSN 0968-4093

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.